Skip to content
Flatbed Dispatch

Flatbed Dispatch Services for Open Deck Carriers

Open deck freight pays better because fewer trucks can legally haul it. A MetaSys dispatcher books your flatbed, step deck, or RGN, confirms weight, dimensions, and tarp requirement before you commit, and gets tarp pay and permit costs written onto the rate confirmation. Same dedicated dispatcher model as our truck dispatch service, built around open deck.

Flatbed, step deck, RGNSteel, lumber, machineryTarping and securementOversize permits
Two workers in high-visibility vests pulling a tarp over a loaded flatbed trailer with ratchet straps hanging along the deck
Open deck freight

The load is not booked until the tarp and the permit are settled.

Talk to a dispatcher

30-minute call. No commitment.

48
States we dispatch in
24hr
Carrier onboarding time
7/7
Days per week covered
5%
Lowest dispatch rate
The problem

Open deck loses money on details, not on rates.

Tarping you were never paid for

The rate confirmation says nothing about a tarp until you are at the shipper and the load is going under one. By then every bit of leverage is gone.

Weights and dims that arrive too late

A load that turns out to be 9 feet wide is a permit load, not a bargain. Finding that out at the gate costs you the day and sometimes the freight.

Securement is your signature, not theirs

The shipper loads it. You are still the one at the scale explaining chain count and working load limits. An out of service order follows your safety scores long after the load delivers.

Mill and yard hours nobody mentioned

Steel mills, service centers, and lumber yards run their own receiving windows and plenty of them stop loading early on Friday. A pickup booked an hour late costs you the weekend.

Permits ordered the night before

Every state has its own portal, fee, and lead time, plus daylight-only travel and holiday movement rules. Oversize freight fails on paperwork far more often than it fails on routing.

Freight that disappears in January

Open deck volume tracks construction. When pours and framing stop across the northern tier, a flatbed with no lane plan sits and waits for spring.

What we handle

A van dispatcher books a load. An open deck dispatcher builds one.

Load vetting before you commit

We ask for weight, dimensions, piece count, and who loads before a load is ever offered to you. If it needs a step deck, a stretch trailer, or a permit, you hear it from us and not from the guard at the gate.

Weight, dims, piece count

Tarp pay negotiated as a line item

Tarping is work, in whatever weather the day hands you. We get the tarp requirement and its pay onto the rate confirmation before signature, including removal at the consignee where the receiver expects it.

Steel tarps, lumber tarps

Securement planned with the load

Chain and strap counts, edge protection, coil racks, and dunnage are checked against the federal cargo securement rule for that commodity, and we confirm who supplies them. You should not be buying lumber for somebody else's freight.

49 CFR 393

Oversize permits ordered and routed

Anything past legal width or height moves on state permits. We order them, hold the approved route, and surface daylight-only windows, curfews, and escort thresholds before you plan the trip.

State by state permitting

Receiving hours confirmed, not assumed

Mills, service centers, and lumber yards keep hours the load board does not publish. We confirm them, and on job site deliveries we confirm whether there is a forklift, a crane, or a moffett waiting.

Mills, yards, job sites

Open deck lanes, not one-off loads

We track what you hauled, where it dropped, and what came back out. Open deck markets are thinner than van markets, so the reload is planned before you deliver rather than searched for after.

Reload planned before delivery

Flatbed is one deck inside MetaSys truck dispatch. If you run mixed equipment, the same dispatcher covers your dry van and reefer freight, hooks power only when the trailer belongs to the shipper, and puts the loads too small to justify your deck on a hotshot or a box truck. Freight factoring runs alongside it so a mill pickup does not wait on a 30-day broker check.

Freight we book

The commodities that actually ride on an open deck.

Steel and metals

Coils, plate, structural beams, rebar, and pipe moving out of mills, service centers, and distribution yards. Coils ride in racks or troughs with chains rated for the piece, never straps thrown over the top.

Chains and coil racks

Lumber and building materials

Dimensional lumber, OSB, plywood, trusses, and engineered wood from Southeast and Pacific Northwest mills into yards and homebuilder sites. Almost always tarped, and almost always time sensitive.

Tarped freight

Machinery and equipment

Excavators, dozers, gensets, transformers, and rooftop HVAC units. Once a piece clears legal height on a flat deck it belongs on a step deck or a lowboy, and we book the trailer that actually fits it.

Step deck and RGN

Roofing and interior products

Shingles, drywall, siding, and insulation into supply houses and active job sites, often on a live unload with a moffett or a boom truck. Delivery access decides this freight more than the line haul does.

Moffett and boom offloads

Pipe, OCTG, and energy freight

Line pipe, casing, valves, and skid packages moving into and out of the Permian, the Bakken, and Appalachia. Long pieces, overhang rules, and yard gate hours run the schedule on these loads.

TX, NM, ND, PA

Precast, brick, and block

Precast panels, block, pavers, and concrete pipe into commercial job sites. Dense freight that is unforgiving on axle weight, so the load plan starts at the scale house instead of the deck.

Axle weight planning
Securement and permits

Securement is dispatch work, not just driver work.

Tiedown capacity is checked against the freight, not guessed at. Federal rules put the aggregate working load limit at half the cargo weight or more, plus a tiedown for every ten feet of article length.
Commodity rules get applied by name. Metal coils, dressed lumber, concrete pipe, and heavy machinery each carry their own securement standard, and a broker posting the load rarely says which one applies.
Tarp type is settled before dispatch. A steel tarp and a lumber tarp are not interchangeable, and neither one is free.
Permit files reach you before the truck rolls, with the approved route, the travel window, and any escort requirement attached to them.

Legal limits we check first

Legal width8 ft 6 in
Legal height13 ft 6 in
Federal gross weight80,000 lb
Securement rule49 CFR 393
Load check50 mi, then 150

Past any of these, the load moves on state permits. We order them before you plan the trip.

48
States we dispatch in
24hr
Carrier onboarding time
7/7
Days per week covered
5%
Lowest dispatch rate
Onboarding

From your deck profile to a vetted first load.

01
10 min

Send your equipment profile

MC and DOT numbers, insurance certificate, W-9, and your deck: flat, step, or RGN. Tell us how many chains, straps, and tarps you actually carry. We dispatch to the equipment you have, not the equipment we wish you had.

02
24 hours

Carrier packet setup

We set you up across our broker network and the open deck shippers that match your home base. Nothing is required from you while that runs.

03
24-48 hours

First load, vetted before it reaches you

Weight, dims, tarp requirement, securement plan, and receiving hours come attached to the load offer. You accept or you pass. Nothing gets booked over your head.

04
Ongoing

Lane building every week

We review your per-mile average, your tarped versus untarped mix, and the deadhead out of each drop, then push the repeat lanes that paid. A rate that repeats beats a rate you renegotiate every Monday.

Prefer a system to a phone call? MetaSys AI Dispatch is in early access and built for operators who want the board worked by software. It runs on the same AI and intelligent automation work MetaSys does outside freight. Both are real options, not a contradiction.

The flatbed year

Open deck follows construction, not the retail calendar.

January to March

The trough

Pours and framing stop across the north, mills work through inventory, and open deck capacity crowds into the South and Texas. This is when a lane plan earns its keep and when we move you toward the freight instead of waiting on it.

April to June

The ramp

Building material volume comes back first, then structural steel as projects break ground. Tarped lumber freight tightens well before the boards make it obvious.

July to September

Peak

Job sites, road work, and equipment moves all run at once. This is the window for locking repeat lanes and holding tarp pay, not for chasing the cheapest reload out of a drop.

October to December

The taper

Northern work closes out, ag and equipment moves finish, and holiday movement restrictions start biting permit loads. We book earlier and plan around the shutdown weeks.

Load boards and broker relationships behind your deck

Open deck posts move fast and the good ones rarely sit on a board long. We work the boards and the direct relationships at the same time. MetaSys also operates as a broker agent under contract with licensed US brokerages, which is how brokerage access works alongside dispatch.

DAT OneTruckstop.comEcho GlobalCoyoteCH RobinsonTQLUber Freight

Get your flatbed dispatched

Tell us your deck type, home base, and the lanes you want. A dispatcher follows up within one business day.

No spam. We send your results and one helpful follow-up, nothing more.

Common questions

Questions open deck carriers ask before they sign on

Get started

Ready to put your deck to better work?

Talk to a flatbed dispatcher. Bring your deck type, your home base, and the lanes you will not run, and you will have a load plan and a rate expectation back within one business day.

No contractsNo setup feesTarp pay negotiatedPermits handled